The Risk associated with the hazardous event under study is adequately controlled, by the reduction of severity and / or likelihood, via the application of engineering and/ or administrative hazard controls. Anything that mitigates or ameliorates the risk.
Speak Your Mind
You must be logged in to post a comment.